Position: PROJECT MANAGER (PIPELINE)
Period : From 06/01/2010
Client : PNG LNG (EXXON MOBIL)
Project : PLN LNG Pipeline (Papua New Guinea)
- M USD contract (Engineering, Procurement, Construction, Main Contractor). Engineering, procurement & construction (EPC) of 317 km of 34", 32", 22" pipeline to transport gas through PNG from the Hides Gas Field to Omati landfall. The project also included multiple valves, helipads, scraper traps and metering skids installation. Engineering & procurement was carried out in Mumbai and the PMT office located in Brisbane (Australia).
-
SPIECAPAG
- Project Manager
Colombes
2008 - 2009
Position: PROJECT MANAGER (PIPELINE)
Period : From 06/01/2008 to 15/12/2009
Client : ALNG
Project : ALNG Gas Pipelines (Angola)
200 M USD contract (Engineering, Procurement, Construction, Main Contractor). Engineering, procurement & construction (EPC) of 30km of 18",20" and 22" pipeline to transport gas through Angola from the landfall to the LNG Plant in Soyo. The project also included valve stations, scrapper traps & landfall preparation for ACERGY. Engineering & procurement was carried out in Muscat (Oman) and the PMT office located in Soyo.
-
AMEC SPIE CAPAG
- Project Manager
2006 - 2008
Position: PROJECT MANAGER (PIPELINE)
Period : From 06/12/2006 to 06/12/2008
Client : YLNG (TOTAL)
Project : YLNG Pipeline Project(Yemen)
350 M USD contract (Engineering, Procurement, Construction, Main Contractor). Engineering, procurement & construction (EPC) of 350 km of 38" and 30" pipeline to transport gas through Yemen from the Marib Gas Field to the Balhaf LNG Plant. The project also included take-off stations and valve stations & installation of pipeline in two major escarpments. Engineering & procurement was carried out in Muscat (Oman) and the PMT office located in Sanaa.
-
AMEC SPIE CAPAG
- Project Manager
2003 - 2005
Position: PROJECT MANAGER (PIPELINE)
Period : From 06/01/2003
Client : BP Exploration Shah Deniz ltd
Project : Azeri - Georgian - Turkish Pipeline Project (AGT) - BTC Project (Georgia)
303 M USD contract (Engineering, Procurement, Construction, Main Contractor). Engineering, procurement & construction (EPC) of 249km of 46'' pipeline to transport crude oil through Georgia from the Azerbaijan border to the Turkish border. The project also included three pumping stations (2 in Georgia & 1 in Azerbaijan), 27 block & check valve stations, pigging station, SCADA, FOC, PSD and over 1000 crossings. Engineering & Procurement was carried out in Sharjah with the PMT office located in Tbilisi.
-
AMEC SPIE CAPAG
- Project Manager
2003 - 2006
Position: PROJECT MANAGER (PIPELINE)
Period : From 06/01/2003 to 15/11/2003
Client : BP Exploration Shah Deniz ltd
Project : Azeri - Georgian - Turkish Pipeline Project (AGT) - SCP Project (Georgia)
130 M USD contract (Engineering, Procurement, Construction, Main Contractor). Engineering, procurement & construction (EPC) of 248km of 42" pipeline to transport gas through Georgia from the Azerbaijan border to the Turkish border. The project also included one take-off station, 2 PR stations, 9 valve stations & over 1000 crossings. Engineering & procurement was carried out in Sharjah and the PMT office located in Tbilisi.
-
SPIE CAPAG
- Deputy Construction Manager
Colombes
2000 - 2002
Position: DEPUTY CONSTRUCTION MANAGER
Period : From 06/11/2000 to 02/12/2002
Client : COTCO - CAMEROON OIL TRANSPORTATION CO.
Project : Tchad - Cameroun Pipeline - Section Camerounaise et Tchadienne (Chad / Cameroon)
420 M USD contract (Procurement, Construction, Main Contractor). Engineering, procurement & construction of 1069km of 30" pipeline to transport crude oil from Chad through Cameroon to the Atlantic coast at Kribi. ASC were responsible for a 530km section through Cameroon.
-
SPAC
- Project Manager
Nanterre
2000 - 2000
Position: PROJECT MANAGER (SPAC-GTR)
Period : From 01/03/2000 to 31/10/2000.
Client : ODEP
Project : 30”- ODEP - Mohamedia- MOROCCO
3 M Euro contract (Construction). Construction of 3.5km of 30” pipeline to transport crude oil from MOHAMEDIA port to SAMIR refinery with 1 block valve.
-
SPAC
- Construction Engineer
Nanterre
1999 - 2000
Position : CONSTRUCTION ENGINEER (SPAC-SUBURBAINE)
Period : From 01/01/1999 to 25/02/2000
Client : GAZ de France, SHELL, SPMR, SPSE, Port Autonome de Marseille
Project : Miscellaneous - Construction
4 M Euro of construction works for oil and gas Companies in France (pipeline, valves, hot tapping,…).
-
SPIE CAPAG
- Construction Engineer
Colombes
1998 - 1998
Position: In Charge of Design Office on site (Spie Capag)
Period : from March 1998 till December 1998
Client : TOTAL
Project : TUNU V Field Development Project in INDONESIA (Borneo)
50 M USD contract (Construction). Construction of 60km of 8-20-24" pipeline to transport gas within TUNU field. All laying was made in swamp areas by using push-pull method. Laying of major river crossings by using off-shore lay barge.
-
SPIE CAPAG
- Construction Engineer
Colombes
1997 - 1998
Position: ENGINEER
Period : From 12/05/1997 to 12/03/1998
Client : GAZ DE FRANCE - CNE (2)
Project : Artère des Hauts de France - Lot 2 (France)
19,6 M USD contract (Construction, Main Contractor). Construction of 85km of 44" of pipeline transporting gas from Drincham to Coullemont in Northern France. The project included: 6 block valve stations, 4 take-off stations, 2 micro tunnels, 23 thrustbores, 32 open-cut road crossings and 5 river crossings. Due to wet ground conditions 18km of the pipeline had to be weighed down with concrete saddles.
-
SPIE CAPAG
- Construction Engineer
Colombes
1996 - 1997
Position: ASSISTANT SUPERINTENDENT
Period : From 01/01/1996 to 30/04/1997
Client : MOATTAMA GAS TRANSPORTATION COMPANY Ltd.
Project : Yadana Development Project (Myanmar)
195 M USD contract (Engineering, Procurement, Construction, Main Contractor). Engineering, procurement & construction of 63km of 36" pipeline to transport gas originating from the Yadana Offshore Field to the Thai border. The project also consisted of: 2 block valve stations, 1 N° Pipeline Centre with gas metering facilities & scraper launcher/receiver, 1 N° Metering Station & scraper receiver, 10,000sqm of buildings, 39km of new asphalt service track, 30km of refurbished roads, and 17 bridges with the largest being 96m long.