Review piping and mechanical work-pack Documentation Requirements for Installation, Fabrication, Testing and Inspection to ensure that all the verifications have been carried out and the appropriate check list been completed and signed off properly.
Coordinate and inspect the piping mechanical arrangement and alignment are in line with the design parameters definition requirements. Monitor the final visual and dimensional checks of completed piping systems
Preparation of hydro test pack and final pack UG/AG and attend hydro testing of piping and mechanical systems and Regulations.sub-systems (ITP, ITR,QC procedures, QC forms, final dossiers, weekly/monthly reports, etc.)
-
SPIE Oil & Gas Services
- Piping/ Pipeline Commissioning Supervisor
2013 - 2014
Main activities, responsibilities and brief description of Company/work environment:
SONATRACH-JGC GASSI TOUIL Project (Plant Gas Treating Capacity: 12MMSCFD/ LPG Sphere (3 x 500m3), Condensate Tank (2x 5000m3).): Supervise commissioning activities and ensure work is performed according to company specification and precommissioning / commissioning piping procedures /Start-up. Raise and clear punch list items. Report daily activities & non-conformity to the Commissioning Piping Leader.Supervise sub-contractor activities for commissioning activities: HP test, Leak test ;flushing /air blowing ;inerting test
* Operations of the Pipelines & Gas Gathering Manifold System : Flushing,Pressurisation, , inerting of the surface installations on Wells, flowlines & trunklines and Pigging Work, Pipe lines Pig Launchers & Recovers.
* To assist, the process team for any investigation and rectification job on mechanical equipments and start-up performing /pre-commissioning test.
* To propose some adjustment or modification on the process, to the office. ;
-
SPIE Oil & Gas Services
- Piping/ Pipeline Commissioning Supervisor
2013 - 2014
SONATRACH-JGC GASSI TOUIL Project (Plant Gas Treating Capacity: 12MMSCFD/ LPG Sphere (3 x 500m3), Condensate Tank (2x 5000m3).): Supervise commissioning activities and ensure work is performed according to company specification and precommissioning / commissioning piping procedures /Start-up. Raise and clear punch list items. heat exchangers, Vessels, filters and associated piping systems ; Report daily activities & non-conformity to the Commissioning Piping Leader .Supervise sub-contractor activities for commissioning activities: HP test, Leak test ;flushing
/air blowing; inerting test.
.Internal inspection of vessels horizontal / verticalequipments. Check internal cleanliness of vertical and.horizontal.vessel.
* Operations of the Pipelines & Gas Gathering Manifold System : Flushing ,Pressurisation, , inerting of the surface installations on Wells, flowlines & trunklines and Pigging Work, Pipe lines Pig Launchers & Recovers.
* To assist, the process team for any investigation and rectification job on mechanical equipments (Centrifugal Pumps ;Residue Gas Compressor and Gas Turbine ; Expander Compressor; Regenration Gas Compressor; Sodium Hypochlorite Injection Package (Milton Roy); Emergency Diesel Engine Generator Package (IML Impianti S.R.L.)) and start-up performing /pre-commissioning test.
* Installation checklist for static/rotating equipments. ;
* To propose some adjustment or modification on the process, to the office. ;
-
SPIE Oil & Gas Services
- Piping/ Pipeline Commissioning Supervisor
2013 - 2014
SONATRACH-JGC GASSI TOUIL Project (Plant Gas Treating Capacity: 12MMSCFD/ LPG Sphere (3 x 500m3), Condensate Tank (2x 5000m3).): Supervise commissioning activities and ensure work is performed according to company specification and precommissioning / commissioning piping procedures /Start-up. Raise and clear punch list items. heat exchangers, Vessels, filters and associated piping systems ; Report daily activities & non-conformity to the Commissioning Piping Leader .Supervise sub-contractor activities for commissioning activities: HP test, Leak test ;flushing
/air blowing; inerting test.
.Internal inspection of vessels horizontal / verticalequipments. Check internal cleanliness of vertical and.horizontal.vessel.
* Operations of the Pipelines & Gas Gathering Manifold System : Flushing ,Pressurisation, , inerting of the surface installations on Wells, flowlines & trunklines and Pigging Work, Pipe lines Pig Launchers & Recovers.
* To assist, the process team for any investigation and rectification job on mechanical equipments (Centrifugal Pumps ;Residue Gas Compressor and Gas Turbine ; Expander Compressor; Regenration Gas Compressor; Sodium Hypochlorite Injection Package (Milton Roy); Emergency Diesel Engine Generator Package (IML Impianti S.R.L.)) and start-up performing /pre-commissioning test.
* Installation checklist for static/rotating equipments. ;
* To propose some adjustment or modification on the process, to the office. ;
-
SAIPEM -ENI
- Piping/ Mechanical Supervisor
2010 - 2012
Main activities, responsibilities and brief description of Company/work environment:
- [Group SONATRACH] Project GK3 : GAZODUC48''/PC/PS PIPELINE HASSI R'MEL SKIKDA-ELKALA
. Supervision and management of construction piping and hydro test pack /QC, commissioning gaz (cleaning
drying, Inerting )
. Supervision and coordination of the complete construction (punch lists) .
Period: 3 mois Mission at Group GSA SONATRACH- AGIP ENI
Job/Role: Piping Supervisor Senior
Company: SAIPEM -ENI Department: CONSTRUCTION
Country/Location: ALGERIA
Main activities, responsibilities and brief description of Company/work environment:
- [Group GSA SONATRACH- AGIP ENI] : Supervision and management of Instalation/ExploitationCPF construction pipeline/piping and hydro test pack ,Preparation TIE-IN.( cleaning ,drying, Inerting)
. Supervision and coordination of the complete construction , . Checking of the piping supports conformity with typical drawings;
.Checking of the spools conformity regarding the isometrics, PID and Piping Classes Specification;
. Interface with the Client SH-AGIP;
-
ENI
- Supervisor Senior
Lyon
2009 - 2012
Mechanical&PIPING/ Supervisor Senior
-
SAIPEM ENI
- Supervisor Senior
2009 - 2012
Mechanical&PIPING/ Supervisor Senior
-
SAIPEM -ENI
- Mechanical Supervisor
2009 - 2010
Main activities, responsibilities and brief description of Company/work environment:
- En 2009 [Group GSA SONATRACH- AGIP] Project : 12''-55Km CRUDE OIL-GAS POLYPHASE FLIUD PIPELINE
. Supervision and management of construction pipeline/piping and hydro test pack , commissioning gaz (cleaning
drying, Inerting ) ,Preparation of progress for the project.
. Supervision and coordination of the complete construction
.Checking of the spools conformity regarding the isometrics, PID and TSP Piping Classes Specification;
. Interface with the Client;
-
SAIPEM
- Piping/ Pipeline/ Mechanical Supervisor
Montigny-le-Bretonneux
2009 - 2012
[Group SONATRACH] Project GK3 : GAZODUC48''/PC/PS PIPELINE HASSI R'MEL SKIKDA-ELKALA :
. Supervision and management of construction piping and hydro test pack /QC, commissioning gaz (cleaningdrying, Inerting ); Visual Welding Joint & Request For NDT.
. Supervision and coordination of the complete construction (punch lists/QC), Pigging Work, Pipelines Pig Launchers & Recovers.
- [Group GSA SONATRACH- AGIP ENI] : Supervision and management of Instalation/Exploitation CPF/OIL : construction pipeline/piping and hydro test pack ,Preparation (cleaning ,drying, Inerting) Tie-In (Hot Tapping) with subcontractor BONATI
.Verify piping support and test acceptanceprior for final alignment.
Follow up implementation of corrective actionregarding quality issues on the project.
Settle effective procedures for the satisfactoryperformance of the work in accordance with quality control and inspection test plan.
. Supervision and coordination of the complete construction , . Checking of the piping supports conformity with typical drawings;
. Check the physical condition of anchor boltsand leveling of foundations before erection of equipments
.Checking of the spools conformity regarding the isometrics, PID and Piping Classes Specification;
. Interface with the Client SH-AGIP;
* Demonstrate HSSE leadership and promote a high standard of HSSE behavior within the sub-contractors organizations ;
-
SAIPEM-ENI
- Mechanical&PIPING/ Pipelines Supervisor
2009 - 2012
Supervision and management of Instalation/ExploitationCPF construction pipeline/piping and hydro test pack ,Preparation TIE-IN.( cleaning ,drying, Inerting)
. Supervision and coordination of the complete construction , . Checking of the piping supports conformity with typical drawings;
.Checking of the spools conformity regarding the isometrics, PID and Piping Classes Specification;
. Interface with the Client SH-AGIP;
-
SAIPEM
- Piping/ Pipeline/ Mechanical Supervisor
Montigny-le-Bretonneux
2009 - 2012
[Group SONATRACH] Project GK3 : GAZODUC48''/PC/PS PIPELINE HASSI R'MEL SKIKDA-ELKALA :
. Supervision and management of construction piping and hydro test pack /QC, commissioning gaz (cleaningdrying, Inerting ); Visual Welding Joint & Request For NDT.
. Supervision and coordination of the complete construction (punch lists/QC), Pigging Work, Pipelines Pig Launchers & Recovers.
- [Group GSA SONATRACH- AGIP ENI] : Supervision and management of Instalation/Exploitation CPF/OIL : construction pipeline/piping and hydro test pack ,Preparation (cleaning ,drying, Inerting) Tie-In (Hot Tapping) with subcontractor BONATI
.Verify piping support and test acceptanceprior for final alignment.
Follow up implementation of corrective actionregarding quality issues on the project.
Settle effective procedures for the satisfactoryperformance of the work in accordance with quality control and inspection test plan.
. Supervision and coordination of the complete construction , . Checking of the piping supports conformity with typical drawings;
. Check the physical condition of anchor boltsand leveling of foundations before erection of equipments
.Checking of the spools conformity regarding the isometrics, PID and Piping Classes Specification;
. Interface with the Client SH-AGIP;
* Demonstrate HSSE leadership and promote a high standard of HSSE behavior within the sub-contractors organizations ;
-
SAIPEM Group GSA SONATRACH
- Piping/ Pipeline/ Mechanical Supervisor
2009 - 2009
AGIP] Project : 12''-55Km CRUDE OIL-GAS POLYPHASE FLIUD PIPELINE
. Supervision and management of construction pipeline/piping and hydro test pack ,Tie-In (Hot Tapping) with subcontractor TECPESA and commissioning operations gas (cleaning ,drying, Inerting ) ,Preparation of progress for the project.
. Supervision and coordination of the complete construction , Material receiving and Erection inspection of static equipment verify the Procedure Qualification Record as per, ASME B31.3, API and applicable project specs.
.. Interface with the Client;
-
SAIPEM Group GSA SONATRACH
- Piping/ Pipeline/ Mechanical Supervisor
2009 - 2009
AGIP] Project : 12''-55Km CRUDE OIL-GAS POLYPHASE FLIUD PIPELINE
. Supervision and management of construction pipeline/piping and hydro test pack ,Tie-In (Hot Tapping) with subcontractor TECPESA and commissioning operations gas (cleaning ,drying, Inerting ) ,Preparation of progress for the project.
. Supervision and coordination of the complete construction , Material receiving and Erection inspection of static equipment verify the Procedure Qualification Record as per, ASME B31.3, API and applicable project specs.
.. Interface with the Client;
-
ENGTP (GROUP SONATRACH)
- Engineer
2008 - 2009
Engineering project (As-built ) of oil/gas Production centres / Sonatrach-Region Haoud Berkaoui /
. Conception in piping drawings : of the isometric plans Study of isometric plans (mechanical drawings) and the waiting stitching (drawing with Cadworx plant program).
-
ENGTP
- Mechanical Engineer
2005 - 2009
GROUP SONATRACH
Main activities, responsibilities and brief description of Company/work environment:
: JGC - KBR company / IN AMENAS GAS PROJECT BP/STATOIL/SONATRACH.CPF
. Supervision for the preparation, prefabrication and erection of piping on site.
. Monitor progress of prefabrication and erection works
. Supervision of the piping works, mechanical and rotating equipments erection;
. Checking of the spools conformity regarding the isometrics, PID and TSP Piping Classes Specification;
. Checking of the piping supports conformity with typical drawings;
. Monitoring and checking of the material;
-
ENGTP
- Mechanical Engineer
2005 - 2009
GROUP SONATRACH
Main activities, responsibilities and brief description of Company/work environment:
-
ENGTP
- Mechanical Engineer
2005 - 2009
Engineering project (As-built ) of oil/gas Production centres / Sonatrach-Region Haoud Berkaoui /
. Conception in piping drawings : of the isometric plans Study of isometric plans (mechanical drawings) and the waiting stitching (drawing with Cadworx plant program).
-
ENGTP
- Mechanical Engineer
2005 - 2009
Engineering project (As-built ) of oil/gas Production centres / Sonatrach-Region Haoud Berkaoui /
. Conception in piping drawings : of the isometric plans Study of isometric plans (mechanical drawings) and the waiting stitching (drawing with Cadworx plant program).
-
ENGTP
- Mechanical Engineer
2005 - 2009
GROUP SONATRACH
Main activities, responsibilities and brief description of Company/work environment:
-
ENGTP (GROUP SONATRACH)
- Mechanical Engineer
2005 - 2005
. Supervision for the preparation, prefabrication and erection of piping on site.
. Monitor progress of prefabrication and erection works
. Supervision of the piping works, mechanical and rotating equipments erection; Material inspections and verifications with certificates and project specifications
. Checking of the spools conformity regarding the isometrics, PID and TSP Piping Classes Specification; Internal inspection of vessels horizontal / verticalequipments. Check internal cleanliness of vertical and horizontal vessel priorfor equipment temporary or final box-up. Verify the final gasket to beinstalled during final box-up.
. Checking of the piping supports conformity with typical drawings; Inspection during fabrication of pipe spools and pipe supports at shop and field
. Monitoring and checking of the material; Material receiving and Erection inspection of static rotating equipments.
-
ENGTP (GROUP SONATRACH)company
- Mechanical Engineer
2005 - 2005
: JGC - KBR company / IN AMENAS GAS PROJECT BP/STATOIL/SONATRACH.CPF
. Supervision for the preparation, prefabrication and erection of piping on site.
. Monitor progress of prefabrication and erection works
. Supervision of the piping works, mechanical and rotating equipments erection;
. Checking of the spools conformity regarding the isometrics, PID and TSP Piping Classes Specification;
. Checking of the piping supports conformity with typical drawings;
. Monitoring and checking of the material;
-
ENGTP (GROUP SONATRACH)
- Mechanical Engineer
2005 - 2005
. Supervision for the preparation, prefabrication and erection of piping on site.
. Monitor progress of prefabrication and erection works
. Supervision of the piping works, mechanical and rotating equipments erection; Material inspections and verifications with certificates and project specifications
. Checking of the spools conformity regarding the isometrics, PID and TSP Piping Classes Specification; Internal inspection of vessels horizontal / verticalequipments. Check internal cleanliness of vertical and horizontal vessel priorfor equipment temporary or final box-up. Verify the final gasket to beinstalled during final box-up.
. Checking of the piping supports conformity with typical drawings; Inspection during fabrication of pipe spools and pipe supports at shop and field
. Monitoring and checking of the material; Material receiving and Erection inspection of static rotating equipments.
-
SARPI-SARPI /ABB-SONATRACH
- Works Engineer
2003 - 2004
. Supervision for the preparation, prefabrication and erection of piping on site , and rotating equipments installation ; structural steelwork, fabrication, pump packages, Tank construction, Vessels, filters and associated piping systems.
. Verify the release note of civil about foundationready preparation for alignment and leveling. Checked setting of padding plates,sole plates or mounting plates and verify the elevation and coordinates for X –Y axis preparation for erection. Checked anchor bolt projection and anchor boltcentering as per equipment requirements.
. Check equipment orientation before and aftererection.
.Engineering and conception in piping Preparation of hydro test pack and final pack documentation (PID, ISO, drawing hydro test...) Reception of materials(fitting…) verify the Procedure Qualification applicable project specs .
-
SARPI
- Works Engineer
nanterre
2003 - 2004
Main activities, responsibilities and brief description of Company/work environment:
- 2004 Project :Stations of Pumping OIL OK1-34'' pipeline . HEH-SKIKDA/
. Supervision of the revamping works in the existing construction.
. Supervision for the preparation, prefabrication and erection of piping on site , and rotating equipments erection;.
.Engineering and conception in piping Preparation of hydro test pack and final pack documentation (PID,
ISO, drawing hydro test...) Reception of materials(tee, reduction.
-
SARPI-SARPI /ABB-SONATRACH
- Works Engineer
2003 - 2004
. Supervision for the preparation, prefabrication and erection of piping on site , and rotating equipments installation ; structural steelwork, fabrication, pump packages, Tank construction, Vessels, filters and associated piping systems.
. Verify the release note of civil about foundationready preparation for alignment and leveling. Checked setting of padding plates,sole plates or mounting plates and verify the elevation and coordinates for X –Y axis preparation for erection. Checked anchor bolt projection and anchor boltcentering as per equipment requirements.
. Check equipment orientation before and aftererection.
.Engineering and conception in piping Preparation of hydro test pack and final pack documentation (PID, ISO, drawing hydro test...) Reception of materials(fitting…) verify the Procedure Qualification applicable project specs .
-
SAIPEM-ENI
- Mechanical Engineer
2002 - 2003
(Group/SpieCapg- Saipem GEIE )
Department: CONSTRUCTION
/ HASSI MESSAOUD- HEH./
Main activities, responsibilities and brief description of Company/work environment:
-
SAIPEM-GEIE
- Mechanical Engineer
2002 - 2003
[GROUP Spie Capg - Saipem Geie .] Project OZ2 : Station of Pumping OZ2-34 Pipeline OIL . HEH-ARZEW
. Conception piping work , Preparation of hydro test pack and final pack documentation (PID, ISO, drawing hydro test...) Reception of materials(tee, reduction ...)
. Material receiving and Erection inspection of structural steelwork ; static and rotating equipment
. Checking of the piping supports conformity with typical drawings;
-
SAIPEM-ENI
- Mechanical Engineer
2002 - 2003
(Group/SpieCapg- Saipem GEIE )
Department: CONSTRUCTION
/ HASSI MESSAOUD- HEH./
Main activities, responsibilities and brief description of Company/work environment:
-
SAIPEM-GEIE
- Mechanical Engineer
2002 - 2003
[GROUP Spie Capg - Saipem Geie .] Project OZ2 : Station of Pumping OZ2-34 Pipeline OIL . HEH-ARZEW
. Conception piping work , Preparation of hydro test pack and final pack documentation (PID, ISO, drawing hydro test...) Reception of materials(tee, reduction ...)
. Material receiving and Erection inspection of structural steelwork ; static and rotating equipment
. Checking of the piping supports conformity with typical drawings;
-
SAIPEM-ENI
- Mechanical Engineer
2002 - 2003
(Group/SpieCapg- Saipem GEIE )
Department: CONSTRUCTION
/ HASSI MESSAOUD- HEH./
Main activities, responsibilities and brief description of Company/work environment:
-
GROUP Spie Capg – Saipem Geie
- Mechanical Engineer
2002 - 2003
[Mechanical Engineer .] Project OZ2 : Station of Pumping OZ2-34 Pipeline OIL . HEH-ARZEW
. Conception piping work , Preparation of hydro test pack and final pack documentation (PID, ISO, drawing hydro test...) Reception of materials(tee, reduction ...)
. Checking of the piping supports conformity with typical drawings;
EXPERIENCES - OUTSIDE SAIPEM GROUP
-
National Company of Mechanical
- Responsible of Technical Service
2001 - 2002
Responsible of Technical Service
Unit of Production : Machine tool Numeric and plastic injection :
. Conception in mechanical drawings (drawing with Solide Works 3D and CAO program).
. Machining all pieces mechanics and Supervision of the production
-
E.C.M.K
- Responsible of Technical Service
2001 - 2002
Job/Role: Responsible of Technical Service
Company: E.C.M.K(National Company of Mechanical Construction Department: Production
Country/Location: ALGERIA./ KHENCHELA
Main activities, responsibilities and brief description of Company/work environment:
Unit of Production : Machine tool Numeric and plastic injection :
. Conception in mechanical drawings (drawing with Solide Works 3D program).
. Machining all pieces mechanics and Supervision of the production.
-
National Company of Mechanical
- Responsible of Technical Service
2001 - 2002
Conception in mechanical drawings (drawing with Solide Works 3D program).
. Machining all pieces mechanics and Supervision of the production.
-
National Company of Mechanical
- Responsible of Technical Service
2001 - 2002
Responsible of Technical Service
Unit of Production : Machine tool Numeric and plastic injection :
. Conception in mechanical drawings (drawing with Solide Works 3D and CAO program).
. Machining all pieces mechanics and Supervision of the production
-
SAIPEM
- Superviseur
Montigny-le-Bretonneux