MISSIONS
AIRBUS January 2003 / TODAY : security, monitoring & performance CONFIDENTIAL
LA POSTE DPI – July 2002/ December 2002 – (cumulated duration : 6 month ) –
Position :Technical Environment : TIVOLI system engineerTivoli Framework 3.7.1, Tivoli Enterprise Console 3.7.1, IBM Tivoli Monitoring 5.1Unix (Sun 8, Solaris 2.6, HP 10.2, HP 11 ),Windows 2000, Windows NT, Citrix), Sybase 12x, Netbackup, CFT, MS-Project
Project of Monitoring Server end Application
· Optimise the capability of the IT Infrastructure, services and supporting organisation to deliver a Cost effective and sustained level of Availability that enables the business to satisfy its business objectives
· Understand the Availability requirements of the business and to plan, measure, monitor and continuously strive to improve the Availability
· Setting up a resolution methodology for the technicians
· Audit the solution Tivoli from the department “post service” and “financial service”
· Design and writing of organisation, architecture and detailed specifications
· Deployment, configuration and testing the architecture with the new product Tivoli Monitoring 5.1
Goal of mission:
· To provide a single point of contact for Customers after the roll out
· To facilitate the restoration of normal operational service with minimal business impact on the Customer within agreed service levels and business priorities
EADS AIRBUS SA – October 2001 / June 2002 – (cumulated duration : 9 month ) –
Position :Technical Environment : TIVOLI system engineerTivoli Framework 3.7.1, Tivoli Enterprise Console 3.7.1, Distirbuted Monitoring 3.7, SIS 3.7.1, LDAP, Lotus NotesUnix (Sun 8, Solaris 2.6, HP 10.2, HP 11 ),Windows 2000, Windows NT, Citrix), Oracle,PL/SQL
Project of infrastructure Tivoli evolution
Department Integration / Production
· Applications requirement for Tivoli monitoring
Application analyse (Lotus Domino, File2Web, E-Sourcing, LDAP)
Manager Application Interview
Create the sentry profile and definition installation process
Test and evaluation monitoring
Design and writing of specifications.
· Person in charge for the technical communication with the production entity
· Installation from scratch the platform Tivoli Framework 3.7.1, TEC 3.7.1
IBM – January 2001 / September 2001 (cumulated duration : 8 month ) –
Position :Technical Environment : System Engineer UniX - OracleOrcale, Aix, UniX-NCR, HP-UX, LinuX, Windows 2000, CFT, Business Object, Lotus Notes, Token Ring, Ethernet
Design and Consolidation of UniX-Oracle server for the Lyonnaise Water Compagny
· Design and migration the file system of Oracle Application from UFS in VxFS
· Analyse and create the exploitation documentation of server
· Expert system of NCR
· Improved relationships with satisfied IBM Customers and Lyonnaise Customers
· Service monitoring also shows where Customer or User actions are causing the fault and so identify where working efficiency and/or training can be improved
Analysis of the Application UniX – Oracle :
· Contention (data, file, memory, processor)
· Inappropriate distribution of workload across available resource
· Inappropriate locking strategy
· Inefficiencies in the application design
· Unexpected increase in transaction rates
· Inefficient use of memory
NATEXIS Popular Bank - BRED– May 1999 / December 2000 (cumulated duration : 1 years 7 month) –
Position :Technical Environment : System Engineer WindowsWindows 98/NT4/2000,AiX, UniX NCR, CFT, Swift, Asset Center, GL Trade
Project of Administration and integration Windows NT
· Problem resolution of year 2000
Create a testing environment for integration
