Alexandre Noirie
WUHAN - China
| English | French |
Schools attended |
INSA Lyon (INSA Lyon) |
Since 2006: NFM Technologies |
Site manager, Electric and PLC supervisor
| |
Conception, Construction, Manufacturing and Installation of Tunnel Boring Machines. CHINA, WUHAN Yangtze river crossing tunnel project, two 11.38 meters diameter slurry TBM. In charge of electric connections, machines comissioning and trouble shooting. Then in charge of the jobsite management. | |
Sector: Mechanical industries |
2004 - 2006 : INTECH |
Mechanical, Electric and Program conception
| |
Manufacturing, design, conception and technical analyse of bottle packaging machines and conveyors. | |
Sector: Packaging |
2004 : CHABANE |
programming and prototypes conception
| |
small arched stell wire pieces manufacturing | |
Sector: Mechanical industries |
2003 - 2004 : PRIM NATURE |
production management and maintenance
| |
vegetables packaging | |
Sector: Packaging |
2003 : THERMAL CERAMIC / MORGAN |
Machine maintenance and worker
| |
Ceramic insulators manufacturing | |
Sector: Chemical industries |
